Great projects should feel effortless.

From concept to handover, we protect the Client’s interest, ensuring quality, safety and environment compliance, maximizing the allocated budget, and achieving the timeline.

#01
Project Management & Consultancy
#02
Cost Control & Cost Management
#03
Risk Management
#04
Civil Engineering Consultancy
Trusted by the organizations we’ve helped build
Behind the Projects

Shaping Projects That Stand the Test of Time

35 years in Engineering and Construction: 15 in Projects Planning & Cost Control and 20 in Project Management & Consultancy for Commercial Buildings, Infrastructures and Oil & Gas industries.

Let’s Build Something Meaningful Together
Ronnie G. Acebuche

Ronnie G. Acebuche

Company Owner · Professional Portfolio

Specialized in Planning, Scheduling, Cost Control, Contractor Supervision, Earned Value Management, Invoice & Payment Evaluation and Certification, Executive Summary Reporting, Contracts Administration, Risk Management, Delays & Recovery Planning, Claims & Arbitration. Mainly to protect the interest of the Client: to ensure Quality, Safety & Environment compliance, the Budget Allocated is maximized and the Timeline is achieved.

B.Sc.
Bachelor of Science in Civil Engineering
2003
PROJACS Project Management School, Dubai. Projects Planning, Scheduling and Cost Control
2009
Cambridge Project Management School, Abu Dhabi. Project Management Professional (PMP)
Contact
+971 50 491 6903
ronnie@acespmc.com / sonstorm@hushmail.com
35+
Years in Engineering & Construction
28
Years of experience in the UAE
20
Years in Project Management & Consultancy
15
Years in Projects Planning & Cost Control
Iconic Projects

Ronnie Acebuche, Strategic Project Portfolio & Key Involvements

Major projects across Commercial Buildings, Infrastructure and Oil & Gas, from the world’s biggest mall to strategic national pipelines and NEOM’s giga-projects.

The Dubai Mall
Downtown Dubai Dubai Mall Aquarium
#01

The Dubai Mall

Current biggest mall in the world with 550,000 SM and 1,200 shops.
Position: Planning and Cost Control Manager / Variation and Claims Analyst
$1.8BProject Cost (USD)
ADCOP Pipeline
ADCOP Route Map Pipeline works
#02

Abu Dhabi Crude Oil Pipeline (ADCOP)

409 km distance with a capacity of 1.5 Million B/D.
Position: Project Controls Manager for Planning, Cost Control, Delays Analysis & Recovery Planning, Claims & Arbitration
$3.3BProject Cost (USD)
Pumping Station
Shuweihat Scheme Map Water infrastructure
#03

Shuweihat Water Transmission Scheme

Water pipelines of 240 km and four pumping stations.
Position: Planning Manager for Planning & Scheduling
$800MProject Cost (USD)
Gas Turbine Power Plant
#04

150MW Gas Turbine Power Plant

150MW (5×30MW) Gas Turbine Generator, 132kV Overhead Transmission Lines and Fuel Gas Transfer Pipelines.
Positions: Project Controls Manager and Subcontracts Manager
$600MProject Cost (USD)
Presidential Airport Terminal
Airport Aerial State Guest Terminal Interior
#05

H.H. Sheikh Khalifa Bin Zayed Al Nahyan Presidential Airport

Presidential Airport and State Guest Terminal in Abu Dhabi.
Position: Project Planning and Cost Control Manager
$650MProject Cost
Royal Pearls Meydan
#06

Royal Pearls, Meydan Dubai

12 Commercial and Residential Buildings.
Position: Planning Manager and Claims Specialist
$330MProject Cost (USD)
B250 Aircraft CALIDUS
#07

B250 Aircraft Development

Program Manager, PMO Department
  • Baseline Schedule preparation, Weekly & Monthly Look-Ahead Plans with the Engineering Team
  • Supply Chain follow-up so materials arrive on time; recovery plans when delays occur
  • Monthly summary of actual progress, variances and critical activities; Executive Dashboard reporting
CALIDUS LLCUnited Arab Emirates
OXAGON Project ENOWA NEOM
#08

First Desalination Plant, Buildings & Infrastructure (OXAGON)

Head of PMO, NEOM ENOWA Water & Energy Division
  • Project Control Framework ahead of the EPC phase: procedures, guidelines and policies
  • Baseline Schedule, Risk Management & Mitigation Plan, QA Manual, HSE Plan, Procurement Plan
  • Organizational structure, manpower resource planning and recruitment job descriptions
NEOMSaudi Arabia
Elmreisa Free Zone National Development Agency
#09

Marine Works and Elmreisa Free Zone

Senior Project Controls Manager
  • Contractual Baseline Schedule: workshops with key disciplines, integration of all work packages
  • Project Control procedures, document management, communication & reporting plans
  • Procurement strategies, progress tracking, risk mitigation, QA Manual and HSE Plan
Benghazi, LibyaSept 2025 to Present
What We Do

ACES Project Management & Consultancy Services

A complete path from the Client’s dream and vision to project award and hand-over, with full transparency at every step.

#01
Project Concept Development
Client’s Dream & Vision
#02
Urban and Community Planning
Strategic and Space Planning
#03
Engineering & Contractors’ Selection
Specialized Company
#04
Tender Invitation
Selected and Experienced Company
#05
Bid Opening & Evaluation
Full Transparency & Fair Scrutiny
#06
Company Interviews
Questions & Answers, Technical & Experiences
#07
Company Visit & Inspection
Actual Verification & Validation
#08
Comparative Analysis
Wholistic Scrutiny and Analysis
#09
Shortlisting & Final Selection
Recommendation & Project Award
#10
Project Management
Strategizing, Planning, Scheduling, Cost Control & Allocation through to Commissioning Certificate and Project Hand Over

Full Project Management Scope

Everything the #10 stage covers, run by one accountable consultancy:

Strategizing Planning &Scheduling Cost Control &Allocation Project ControlsProcedures QualityAssurance HSECompliance RiskManagement Progress BillingEvaluation & Approval Delays Analysis &Recovery Planning Claims &Arbitration PaymentCertification ExecutiveSummary CommissioningCertificate ProjectHand Over ProjectManagement
Hover to highlight · drag any node to rearrange the map
Strategizing
Planning & Scheduling
Cost Control & Allocation
Project Controls Procedures
Quality Assurance
HSE Compliance
Risk Management
Progress Billing Evaluation & Approval
Delays Analysis & Recovery Planning
Claims & Arbitration
Payment Certification
Executive Summary
Commissioning Certificate
Project Hand Over
How We Work

The 16-Step Project Control Framework

From contract scope to claims evaluation, the discipline that keeps every deliverable measurable, sequenced and on budget.

01
Define Project Description
Scope of Work Description from the Contract
02
Project Milestones
Durations and Timeline of the Project
03
Define Project Work Package
Identify WBS by Discipline and Phases
04
Define Phases & Work Sequence
Priority and Sequence of Work
05
Define Resources Requirements
Advance Preparation and Planning
06
Manpower Mobilization Plan
Specialized Resources Planning for HR
07
Procurement Plan
Long Lead Items and Specialized Materials
08
Material Delivery Schedule
PO Issuance to Availability on Site
09
Detailed Work Breakdown Structure
Activities by Phases and Discipline
10
Detailed Schedule
Activities with Logical Links and Resources
11
Prepare Baseline Schedule
Complete deliverables with logical sequences, proper duration and cost allocation across Engineering, Procurement, Construction and Commissioning
12
Constant Coordination & Monitoring
Look-Ahead Plans, weekly meetings, risks, delays & recovery, safety and quality assurance
13
Weekly & Monthly Summary Reports
Baseline vs. Actual, productivity and cost reports, Executive Summary
14
Maintain the Baseline Schedule
Keep work compliant; recovery planning when delays occur
15
Payment Certification
Contractor’s invoice vs. actual Earned Value achievement
16
Claims Evaluation
Scope changes, variations, abortive works, additional materials and manpower
The Crucial Added Value

One Consultancy Between the Client and Every Project

ACES serves as a single point of accountability between the client and every project, ensuring audited performance, achieved timelines, and executive-level reporting to clients.

Project Owner / Client
ACES PMC
Scope of Control
  • Planning & Scheduling
  • Contract Management
  • Cost Management
  • Payment Certification
  • Risk Management
  • Delays & Mitigation
  • Claims Management
  • Procedures & Compliances
The Crucial Added Value
  1. Internal Audit: Evaluation of the Expected Project’s Performance against the Actual Project’s Outcome.
  2. Timeline & Cost Compliances: Provides assurances to achieve the timeline and project cost allocation.
  3. Executive Report: Provides summary reports based on the actual performance to the Client / Management.
Project 1
Project 2
Project 3
Project 4
Project 5